Surrey
This was a green field installation which was necessitated by demand for gas on the outer fringes of National Grid operations and located within an area of natural beauty. Rush Construction Services were able to design sensitively for the surroundings and assist in the management of construction to ensure a successful outcome.
An innovative aspect of the project was the full fiscal metering capability, including temperature/pressure correction and CV measurement by gas chromatography, which was incorporated within the Design, as the station was a custody transfer facility between different network operators. In addition, the site was landscaped sympathetically to provide excellent noise attenuation and visual camouflage in this area of natural beauty.