Spalding
RCS completed the Design of a gas supply to a new 300MW open cycle gas turbine as part of a Gas Turbine Expansion Project at Spalding. The design included the connection to an existing above ground installation, a new 70bar pipeline, and a new Gas Receiving Facility (GRF) for the new turbine.
The new GRF included filtering, a fiscal metering system, pressure reduction, a bespoke two-stage heating system and all associated electrical, instrumentation and telemetry systems.
The new GRF and pipeline were designed to the requirements of IGEM/TD/1, IGEM/TD/13, IGEM/TD/12 and IGEM/SR/25.